Why Environmental Analysis at Concept Stage Saves Architects Time and Money
The cost of running environmental analysis after the concept is locked, and what changes when it enters the project in week one instead of week twelve.
Coming SoonInsights
Articles on environmental simulation, parametric design, and how architecture teams use building physics analysis to produce better buildings and stronger project submissions.
The cost of running environmental analysis after the concept is locked, and what changes when it enters the project in week one instead of week twelve.
Coming SoonA plain-language explanation of Ladybug Tools for architects who have heard the name but haven't seen it used. What it analyses, what it produces, and what a firm needs to use it.
Coming SoonA step-by-step look at how a parametric Grasshopper workflow runs solar radiation, daylight factor, and thermal performance analysis during design development, before the facade is specified.
Coming SoonPlanned Articles, Later in 2026
Working on a Project That Needs Environmental Performance Analysis?
These articles explain the methodology behind the SHELL Protocol: a structured process for bringing environmental performance analysis into the design process from the earliest stage.